<< Click to Display Table of Contents >>

SM-J-Q BOM Recursion Utility

Purpose of Program

Use this program to check your BOM structure for "Loops" - an item entered in a lower level of its own Bill of Materials.  Such loops can cause the MRP generation and Standard cost rollup programs to run forever.

General Program Operation

Enter from/thru ranges of items and indicate which types to include.  Including nested detail means that the report will show the levels and sublevels that have the loop.  If a problem is detected, the BOM will be shown on the report.  If none are found, the report heading will print with no entries.